This railroad is based in the fall of 1948 in Lafayette, Indiana. Four railroads (Monon, Wabash, New York Central, and Nickel Plate) interchanged with each other in Lafayette at this time. In 1948, 50 trains typically came through across those railroads in a 24 hour period. Each mainline is several hundred feet long.
Garry Smith
LocationLafayette, IN
ScaleHO
Layout Size48 ft x 30 ft
Era1948
Crew Complement10
CompletionTrack: 100%
Scenery: 80%
Digitrax
None