Spur Lines time frame is during the transition period from steam to diesel. The layout has approximately 250 feet of main line with 133 turnouts using Fast Tracks jigs. All turnouts are powered by tortoise switch machines. The track work is complete and scenery is about 90% complete. In a typical session with 4 road crews each operator will run 3 trains and will make at least one switching operation in each town. The layout for the most part, follows typical railroad operation.
With 3 yards and 11 towns there is a lot of switching for the operators.
Remember to ask operations organizer for the HOA gate code before you leave home or the hotel.
Tommie White
LocationTerrell, TX
ScaleHO
Layout Size29 ft x 24 ft
Mainline Size1000 ft
EraTransition Period
Crew Complement5 - 7
CompletionTrack: 100%
Scenery: 90%
Electrical: 100%
Digitrax
Communications SystemDispatcher, may I
Dispatching MethodVerbal/Mother-May-I
None